Embedded Capacity Register - February 2022
All distributed generation with a capacity of 1MW or above captured in a consolidated format including generator type, location, capacity and wider key information.
Data Dictionary
Title | Type | Label | Description | Example |
---|---|---|---|---|
Export MPAN / MSID | numeric | The core meter point administration number, a 13-digit reference used in MPAS to identify the relevant Metering Point. |
2100040023638 | |
Import MPAN / MSID | text | The core meter point administration number, a 13-digit reference used in MPAS to identify the relevant Metering Point. |
2100040023637 | |
Customer Name | text | Name of party that is connected or contracted to connect. |
AB InBev UK Limited | |
Customer Site | text | Name of customer site/project name. |
CE RUSH WALL TURBINE LIMITED | |
Address Line 1 | text | Address line 1 of the Customer Site. |
WHITBREAD BREWERY | |
Address Line 2 | text | Address line 2 of the Customer Site. |
MAGOR | |
Town/ City | text | Town / City of the Customer Site. |
NEWPORT | |
County | text | County of the Customer Site. |
SHROPSHIRE | |
Postcode | text | Postcode of the Customer Site. |
NP26 3DA | |
Country | text | Postcode of the Customer Site. |
United Kingdom | |
Location (X-coordinate): Eastings (where data is held) | numeric | Six digit British National Grid X coordinate of the Customer Site. |
321941 | |
Location (y-coordinate): Northings (where data is held) | numeric | Six or seven digit British National Grid Y coordinate of the Customer Site. |
162247 | |
Grid Supply Point | text | The point of connection between the transmission system and the distribution system that is linked with the Customer Site. |
Uskmouth | |
Bulk Supply Point | text | The supply point on the distribution system (representing an EHV/EHV transformation level) that is linked with the Customer Site. |
Magor | |
Primary | text | The primary substation on the distribution system that is linked with the Customer Site. |
Trowbridge Primary | |
Point of Connection (POC) Voltage (kV) | text | kV | The voltage at the Point of Connection to the distribution system. |
11 |
Licence Area | text | Licence area Customer Site is connected within |
Western Power Distribution (South Wales) plc | |
Energy Source 1 | text | The energy source type used in the production of electricity |
Wind | |
Energy Conversion Technology 1 | text | The technology type that export electricity onto a distribution system |
Onshore wind turbines | |
CHP Cogeneration (Yes/No) | text | Indicates whether the generation in the Customer Site forms part of a CHP scheme. |
No | |
Storage Capacity 1 (MWh) | text | MWh | This is the energy capacity of the storage facility (MWh). |
0 |
Storage Duration 1 (Hours) | numeric | Hours | Divide the storage capacity (MWh) by the Registered Capacity (MW) and round it down to the nearest 0.5 (half-hour) |
0 |
Energy Source & Energy Conversion Tech 1 - Registered Cap (MW) | numeric | MW | This is the Registered Capacity of the "Energy Source 1" expressed in MW. |
11.307 |
Energy Source 2 | text | Where there is more than one plant type at a site, the "Energy Source 2" and "Energy Source 3" fields would be used to show the energy source types additional to the "Energy Source 1". |
Solar | |
Energy Conversion Technology 2 | text | Defined for “Energy Conversion Technology 1”. |
Photovoltaic | |
CHP Cogeneration 2 (Yes/No) | text | Indicates whether the generation in the Customer Site forms part of a CHP scheme. |
Yes | |
Storage Capacity 2 (MWh) | text | MWh | This is the energy capacity of the storage facility (MWh). |
0 |
Storage Duration 2 (Hours) | numeric | Hours | Divide the storage capacity (MWh) by the Registered Capacity (MW) and round it down to the nearest 0.5 (half-hour). |
5 |
Energy Source & Energy Conversion Tech 2 - Registered Cap (MW) | numeric | MW | This is the Registered Capacity of the "Energy Source 2" expressed in MW. |
4 |
Energy Source 3 | text | Where there is more than one plant type at a site, the "Energy Source 2" and "Energy Source 3" fields would be used to show the energy source types additional to the "Energy Source 1". |
Biofuel landfill gas | |
Energy Conversion Technology 3 | text | Defined for “Energy Conversion Technology 1”. |
Gas turbine (OCGT) | |
CHP Cogeneration 3 (Yes/No) | text | Indicates whether the generation in the Customer Site forms part of a CHP scheme. |
No | |
Storage Capacity 3 (MWh) | text | MWh | This is the energy capacity of the storage facility (MWh). |
10 |
Storage Duration 3 (Hours) | numeric | Hours | Divide the storage capacity (MWh) by the Registered Capacity (MW) and round it down to the nearest 0.5 (half-hour). |
5 |
Energy Source & Energy Conversion Tech 3 - Registered Cap (MW) | numeric | MW | This is the Registered Capacity of the "Energy Source 3" expressed in MW. |
3 |
Flexible Connection (Yes/No) | text | Indicates whether the connection is subject to a flexible connection arrangement e.g. Active Network Management (ANM) during system normal conditions. |
No | |
Connection Status | text | “Connected" or "Accepted to Connect"? |
Connected | |
Already connected Registered Capacity (MW) | numeric | MW | This is the total Registered Capacity of generation already connected at the site expressed in MW. |
11.902 |
Connected Maximum Export Capacity (MW) | numeric | MW | This is the total MW export capacity permitted as per the connection agreement. |
3.325 |
Connected Maximum Export Capacity (MVA) | numeric | MVA | This is the total MVA export capacity permitted as per the connection agreement. |
3.5 |
Connected Maximum Import Capacity (MW) | numeric | MW | This is the total MW import capacity permitted as per the connection agreement. |
6.65 |
Connected Maximum Import Capacity (MVA) | numeric | MVA | This is the total MVA export capacity permitted as per the connection agreement. |
7 |
Date Connected | text | DD/MM/YYYY HH:MM:SS | Date the connection was provided in the case of a new connection. In cases where there was an existing connection, this is date the new equipment was connected. |
11/08/2020 00:00:00 |
Accepted to Connect Registered Capacity (MW) | text | MW | This is the Registered Capacity of generation that is not already connected, but has been Accepted to Connect, expressed in MW. |
126.316 |
Accepted Change to Maximum Export Capacity (MW) | text | MW | This is the new/additional MW export capacity (i.e. not yet connected) that has been accepted to connect as per the connection agreement. |
60 |
Accepted Change to Maximum Export Capacity (MVA) | text | MVA | This is the new/additional MVA export capacity (i.e. not yet connected) that has been accepted to connect as per the connection agreement. |
63.158 |
Accepted Change to Maximum Import Capacity (MW) | text | MW | This is the new/additional MW import capacity (i.e. not yet connected) that has been accepted to connect as per the connection agreement. |
60 |
Accepted Change to Maximum Import Capacity (MVA) | text | MVA | This is the new/additional MVA import capacity (i.e. not yet connected) that has been accepted to connect as per the connection agreement. |
63.158 |
Date Accepted | text | DD/MM/YYYY HH:MM:SS | Date the Customer accepted the connection offer from the DNO or IDNO. |
11/08/2020 00:00:00 |
Target Energisation Date | text | DD/MM/YYYY HH:MM:SS | Estimated date of energisation. This date is likely to change to reflect the latest date notified by customers. |
11/08/2020 00:00:00 |
Distribution Service Provider (Y/N) | text | Indicates whether a service is provided to the DNO. |
N | |
Transmission Service Provider (Y/N) | text | Indicates whether a service is provided to the ESO or a TO. |
N | |
Reference | text | Unique reference to the service(s) being provided. |
TSPREF1 | |
In a Connection Queue (Y/N) | text | Indicates whether the connection to the Customer Site is in a connection queue. |
Y | |
Distribution Reinforcement Reference | text | Unique reference to relevant distribution reinforcement required for connection. |
DREF1 | |
Transmission Reinforcement Reference | text | Unique reference to relevant transmission reinforcement required for connection. |
TREF1 | |
Last Updated | timestamp | DD/MM/YYYY HH:MM:SS | Date on which entry was last updated. |
04/01/2022 01:01:00 |