South Wales BSP Transformer Flows
Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019. -
South West BSP Transformer Flows
Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019 -
East Midlands BSP Transformer Flows
Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019. -
West Midlands BSP Transformer Flows
Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019 -
Fault Level
Fault level data encompassing system impedance, calculated fault levels and ratings. -
Circuit Data
This data set contains the electrical parameters for circuits operating between 132kV and 6.6kV. -
Super Grid Transformer Flows – West Midlands
Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2021. -
Super Grid Transformer Flows – East Midlands
Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2021. -
Super Grid Transformer Flows - South Wales
Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2021. -
Super Grid Transformer Flows - South West
Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2021. -
Supergrid Transformer Access Period Connection Point Peak Demands for mainten...
Supergrid Transformer Access period (weeks 13 - 43) Peak Demands and forecasts during maintenance periods -
Distribution Substation Location (Easting / Northings)
Location of WPD Distribution Substations (Easting / Northings) -
Primary Substation Location (Easting / Northings)
Location of WPD Primary Substations (Easting / Northings) -
WPD Network Capacity Map
Data used to visualise the capacity for the connection headroom of demand and generation on to Bulk Supply Point and Primary substations, including key asset ratings and...