Title Type Label Description Example
Area text Area

The name of the licence area from which the data is taken

EAST
GSP Group text GSP Group

The name of the substation group that the substation is contained within

Berkswell 132kV
BSP text BSP

The substation area to which the substation belongs

Coventry Central
Substation text Substation

The substation to which the node belongs

Courthouse Green 11
Node text Node

Unique node which identifies the substation/transformer.

COUG5J
Voltage text Voltage

The voltage at the substation

11
Max Demand 2019/20 numeric Max Demand 2019/20

The maximum demand seen at the substation between 01/10/2019 to 30/09/2020

13.21
Max Demand 2019/20 PF numeric Max Demand 2019/20 PF

The Power Factor at the substation

0.98
Forecast Load Information 2020/21 numeric Forecast Load Information 2020/21

Forecast Maximum demand year 1.

13.45
Forecast Load Information 2021/22 numeric Forecast Load Information 2021/22

Forecast Maximum demand year 2.

13.68
Forecast Load Information 2022/23 numeric Forecast Load Information 2022/23

Forecast Maximum demand year 3.

13.93
Forecast Load Information 2023/24 numeric Forecast Load Information 2023/24

Forecast Maximum demand year 4.

14.23
Forecast Load Information 2024/25 numeric Forecast Load Information 2024/25

Forecast Maximum demand year 5.

14.64
Firm Capacity numeric Firm Capacity

Firm Capacity of the substation site.

23