Data Dictionary

Title Type Label Description Example
Tender reference text nan

Unique reference of flexibility service tender; where multi-year tender occur, this is shown on multiple lines

CMZ_T5A_EM_0023_T6A
Product text nan

Main flexibility product

Dynamic
Licence area text nan

Distribution Licence area

National Grid Electricity Distribution (East Midlands) Plc
Service location (Grid Supply Point) text nan

Constrant Management Zone (CMZ) name

Berkswell SGT
Service Provider text nan

Name/identifier of the flexibility service provider

Zenobe Energy Limited
Constraint Type text nan

Pre-fault and post-fault constraint type for which a flexibility service was dispatched

Pre-Fault, demand constraint - Outage Conditions
Constraint Management Zone Name text nan

Unique Constraint Management Zone code

CMZ_T5A_EM_0023
Maximum Connection Voltage numeric kV

The maximum voltage at which a connection occurs within a CMZ

132
Main technology text nan

Main technology used against each tender reference against the G99 of the ECR

Other
Secondary Technology (where applicable) text nan

Main technology (where applicable) used against each tender reference against the G99 of the ECR

nan
Dispatchable / non-dispatchable text nan

Information about capability of providers to respond to instruction in real time

Dispatchable
Number of bids received numeric nan

Number of bids received for each tender reference

1
Bid outcome text nan

Accepted / Rejected

Accepted
Flexible Unit reference text nan

Unique ID which links accepted bids to a specific Flexible Unit

TDSB_T6A_000235
Committed contracts / non-committed contracts text nan

Level of commitment within contract to provide a certain agreed level of capacity for dispatch

Non-firm
Flexible Capacity (in MW) numeric MW

Capacity contracted

5
Flexible Capacity (in MVAr) numeric MVAr

Capacity contracted

0
Maximum Run Time (hh:mm) text nan

The maximum time in minutes for which the solution can continuously deliver its flexible capacity

06:00
Response Time (hh:mm) text nan

The lead-time from the time of DSO instruction to full delivery of Flexible Capacity

00:01
Connection voltage (in kV) text kV

Voltage at which a connection is made

nan
Delivery Year numeric nan

Regulatory year the delivery will take place in

2022
Contract start timestamp nan

Date on which a contract is anticipated to start

18/04/2022
Contract end timestamp nan

Date on which a contract is expected to end

18/04/2026
Service days text nan

Days on which a flexibility service is expected to be available

Friday, Monday, Saturday, Sunday, Thursday, Tuesday, Wednesday
Service window 1 FROM (where applicable) text nan

The earliest time of service required within a year

09:30
Service window 1 TO (where applicable) text nan

The latest time of service require within a year

18:00
Service window 2 FROM (where applicable) text nan

Additional time window start

nan
Service window 2 TO (where applicable) text nan

Additional time window end

nan
Original availability fee bid (where applicable, in £/MW/hr) text £/MW/hr

The original availability fee the flexibility requirement was set at within the tender rounds, at which bidding would initiate

63.9
Original utilisation fee bid (where applicable, in £/MWh) text £/MWh

The original utilisation fee the flexibility requirement was set at within the tender rounds, at which bidding would initiate

90.1
Agreed availability fee (where applicable, in £/MW/hr) text £/MW/hr

The agreed availability fee the flexibility requirement has won the bid at within the tender rounds

5
Agreed utilisation price (in £/MWh) numeric £/MWh

The agreed utilisation fee the flexibility requirement has won the bid at within the tender rounds

300
Service fee (in £/MWh) text £/MWh

The agreed service fee the flexibility requirement has won the bid at within the tender rounds

nan
Notes text nan

Additional information as required

nan
Procurement year text nan

Reporting year within which dispatch occurred

2022/23