18 Datasets found

Licenses: WPD Open Data Licence

Filter Results
  • Flexibility – Trades Data and Results

    Overview This dataset contains information on what we will look to put forward in our upcoming trades, with the aim to provide more visibility ahead of the actual trade...
  • LV Load Monitor Data

    Monitoring data from a subset of individual LV substations within NGED licence areas.
  • Distribution Substations

    This dataset provides the distribution substations within NGED's four licence areas and their connection to the primary substation. Key information provided (detailed fully in...
  • Rota Load Disconnection

    The Electricity Supply Emergency Code (ESEC) describes steps which the UK Government could take to deal with a civil or electricity supply emergency, and the actions which...
  • Aggregated Smart Meter Data - LV Feeder

    All DNOs are required by licence condition to comply with Ofgem’s Data Best Practice (DBP) Guidance. The DBP Guidance was updated by Ofgem on 7th August 2023, and the DBP...
  • Aggregated Smart Meter Data - Secondary Substation

    All DNOs are required by licence condition to comply with Ofgem’s Data Best Practice (DBP) Guidance. The DBP Guidance was updated by Ofgem on 7th August 2023, and the DBP...
  • System Planning Archive

    Data files that have been superseded and/or are no longer in active use. The datasets below are historical and have since been superseded. For the latest system planning data,...
  • Network Development Plan (NDP)

    The Network Development Plan (NDP) represents the second step in the network investment planning process, which uses forecasts to analyse and identify future network...
  • Distribution Future Energy Scenarios (DFES)

    The Distribution Future Energy Scenarios (DFES) outline the range of credible futures for the growth of the distribution network, and represents the first step in the National...
  • Distribution Network Options Assessment (DNOA)

    The Distribution Network Options Assessment (DNOA) represents the optioneering phase of the investment planning process, which is the third and final step. More details on its...
  • Flexibility – Reports

    Overview This section of the Flexibility Group focuses on making available regularly produced reports containing procurement and dispatch data. Data The Procurement_Report.csv...
  • System Planning_LV Network Insights

    This dataset has no description

  • Flexibility – Requirements

    Latest analysis tranche reference: T8A Overview We are looking to mitigate a range of constraints across multiple voltage levels on the network. As they involve different...
  • Flexibility – Archive

    Overview Data files that have been superseded and/or are no longer in active use. Data The datasets below are historical and have since been superseded. For the latest...
  • 11kV Transformers

    11kV substations for all NGED areas supplied chunked at OS 20km Grid in zipped ESRI Shapefile (SHP) format
  • 33kV Transformers

    33kV substations for all NGED areas supplied chunked at OS 20km Grid in zipped ESRI Shapefile (SHP) format
  • GSP Technical Limits

    The GSP Technical Limits dataset provides a view of the current technical power limits for the National Grid Electricity Distribution GSPs. This is aligned with Appendix G, so...
  • FIFA World Cup Qatar 2022

    So, what happens when a nation collectively sits down to watch a football match? This dataset contains the demand data for each day of the world cup by Licence Area. As always,...