75 Datasets found

Licenses: WPD Open Data Licence

Filter Results
  • Live GSP Data - East Midlands

    This dataset has no description

  • Live Data

    This dataset has no description

  • EV Capacity

    A list of the Distribution Substations, including the network referencing up to GSP and Local Authority, and a description of the available capacity for EV chargers to be...
  • Embedded Capacity Register

    All distributed generation with a capacity of 1MW or above captured in a consolidated format including generator type, location, capacity and wider key information.
  • Electric Nation

    When launched, Electric Nation was one of the world's largest home smart charging trials with nearly 700 EV owners taking part in the 18-month trial. Between them, our trial...
  • Generation Capacity Register

    The Generation capacity register lists generators that: Are connected to our network ("Connected") Have accepted offers to connect to our network ("Accepted-not-yet-Connected")...
  • Historic Transformer Voltages

    Voltages at half-hourly granularity for all transformers at GSP, BSP & Primary level across South West, South Wales, East Midlands & West Midlands, between April 2019 -...
  • South Wales Primary Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019.
  • Western Power Distribution Data Challenge 3: Estimating Missing Across a Dist...

    This is the final of three Western Power Distribution (WPD) short data challenges! The aims of these challenges include: Demonstrating the value in making data openly...
  • West Midlands Primary Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019.
  • East Midlands Primary Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019.
  • Active Network Management (ANM) Curtailment

    In areas where there are multiple complex constraints affecting a number of customers over a long time period, an Active Network Management (ANM) system will be implemented....
  • DFES

    The Distribution Future Energy Scenarios outline the range of credible futures for the growth of the distribution network. Distribution Future Energy Scenarios aggregated to an...
  • South Wales BSP Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019.
  • South West BSP Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019
  • East Midlands BSP Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019.
  • West Midlands BSP Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019
  • South West Primary Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019.
  • Common Information Model East Midlands

    Common Information Model (CIM) for 132kV , 66kV and 33kV in the East Midlands generated by the WPD Integrated Network Model (INM). For each Grid Supply Point (GSP) there exisits...
  • Common Information Model West Midlands

    Common Information Model (CIM) for 132kV, 66kV, 33kV, and 11kV in the West Midlands generated by the WPD Integrated Network Model (INM). For each Grid Supply Point (GSP) there...